OUR PROJECTS
TSA Headquarters with 560,000+ SQ ft

  • $550,000 Realized Energy Savings/year
  • Optimization of 1,560 Tons of HVAC
  • LED Retrofit of 9,700 Fixtures
  • Power Conditioning of 2,400 HP of motors
  • Improved Power Quality
  • 31% total energy reduction

Air Space Command Center

  • In Depth Energy Audit
  • Electrical System Distribution Study
  • HVAC Air Test & Balance
  • LED Testing and Lighting Design

DHS Passenger Safety and Weapons Test Facility

  • In-Depth Energy Audit and Power Quality Testing
  • LED Design and Test Installation
  • Electrical System Distribution Study
  • Power Quality Study
  • I.R. Heat Testing of Electrical Distribution System

Dominos Sugar Packaging Plant 120,000 SQ. ft

  • Lighting Design
  • LED Retrofit of 120,000 Sq. ft. of office, manufacturing, and warehouse
  • Captured close to 65% of the project cost in BG&E Utility rebates for customer

USA Auto Group

  • Lighting Design
  • LED Retrofit of 100,000 Sq. ft. of showroom, service, and parking lots
  • Captured 95% of the project cost in PEPCO Utility rebates for customer

Gallows One Office Park

  • LED Lighting Retrofit

Sierra Nevada Aerospace Systems
Full LED conversion of mission critical manufacturing clean rooms and general office space.
Park Square Office Complex

  • Installed 50-year “driverless” LED technology
  • Trenched power and erected new 24ft parking lot poles with LED lighting
  • Retrofitted parking to LED

ARKAY Packaging Roanoke VA

  • 24hr / 365 day 160,000 SQ Ft facility.
  • Custom designed and installed NO-UV production LED solutions.
  • Installed “driverless” AC current LEDs rated for 52-year continuous operation.
  • Petitioned and Captured 300% increase of the standard lighting rebates offered by Appalachian Power for the customer.

Carolina Country Club

  • Energy Audit and System Design
  • Optimization of 269 Tons of HVAC
  • Lighting Retrofit of 5 buildings including the Clubhouse

APP Manufacturing Plant

  • Energy Audit and System Design
  • Optimization of 55 Tons of HVAC
  • Lighting Retrofit of Manufacturing, Offices, and Showrooms
  • Captured 30% of the project cost in SCE&G Utility Rebates

DHS Tactical Training Center campus converted to LED lighting
LED Retrofit of entire campus including all parking and street lights, outdoor tactical gun, and sharp shooter ranges, perimeter security lighting, heavy equipment garages, and building lighting.
PRESIDENTIAL PARK 9 Building Complexes With Street Lighting

  • Lighting Design
  • LED Retrofit of 9 condominium towers, common areas, and ubdivision street lighting
  • Captured close to 75% of the project cost in Utility rebates for customer

Muhler Windows Sales Center

  • Energy Audit and System Design

Muhler Windows Manufacturing
Energy Audit and System Design

SC Child Support Services
Energy Audit and System Design

Rose Hill Falls Subdivision
Conversion of all Street Lights to LED

Webster House Condominiums

  • Energy Audit and System Design
  • Optimization of 320 Ton Trane Chiller Plant – HVAC
  • Reactive Power Correction of building Motors
  • Lighting Retrofit of all Common areas, Commercial Offices, and Parking Garages
  • Reduced overall electrical consumption by 10% for the building

Grosvenor Park Condominiums
Energy Audit and System Design
Vornado Properties

  • Energy Audit and System Design
  • LED Lighting Retrofit
  • Reactive Optimization of Motors and Power Quality improvement

Champlain Subdivision

  • Energy Audit
  • Subdivision Street Light Retrofit

Burnside Subdivision

  • Energy Audit
  • Subdivision Street Light Retrofit

Valley Forge Flag Co.
Performed Energy Audit and System Design for the following Facilities:
Distribution Center
Lane Plant
Performed Energy Audit and Lighting System design and retrofit
Smoaks Production Area
Performed Energy Audit and Lighting System design and retrofit
Woodmont Overlook Subdivision
Glen Brier Subdivision
Conversion of all Street and Parking Lights to LED
Westwood Gardens Subdivision
Conversion of all Parking and Grounds Lighting to LED
Miramont Villas
Conversion of all Street Lights and Parking to LED
Windsor Square Subdivision
Conversion of all Street Lights and parking to LED
Prospect House Subdivision
LED Retrofit Including 3 Underground Parking garages to LED
Saddle Ridge Subdivision
Conversion of all Street Lights to LED
Strathmore Park
LED Retrofit of Street Lights, Parking Garages, and Common Areas
Neumann University
Full LED conversion of the  Mirenda Sport Arena and training center in Philadelphia PA
National Park Seminary
Custom Design/Build LED conversion of existing historic style lighting to LED including common area and complete subdivision parking and street light retrofit
Logan Station

  • Energy Audit and system design
  • LED Retrofit of underground parking garages and common area lighting

Loft 24

  • Energy Audit and system design
  • LED Retrofit of all parking lot and common area Lighting

Edgemoor Condos

  • Energy Audit and system design
  • LED Retrofit of the underground parking garage and common area lighting

Pickett Center

  • Energy Audit and system design
  • LED Retrofit of all parking lot and common area Lighting

McLean Tennis and Racquet
Converted all 5 indoor courts to custom LED tennis sports lighting with remote/wireless/Phone app controlled dimming system

Cardinal Hill Tennis and Swim Club
Installation of LSI performance Tennis LED lighting
St Christopher’s School of Richmond
Retrofit of regulation indoor track, basketball courts, and wrestling rooms.

Installed custom dimming system and achieved 104 Fc actual (foot candles), 80 minimum required for scholastic competition guidelines

Riviera Condominium
Rewire/new conduit electrical distribution system of 8 levels of the underground parking garage

Conversion to common area lighting to LED

Caliber Collision Stores
Converted northern VA stores to LED
City First Bank HQ
Complete LED conversion of Executive offices and commercial Lending buildings.
Dulles Trade Center
LED conversion of grounds and office space.
Raging Wire Data Centers, Ashburn VA
Exterior LED retrofit
Brookfield IV Corporate Center
Interior common area and Exterior Lighting converted to LED
Alta Condominium Washington DC

  • Converted all interior common area, parking garage, and Exterior to LED
  • Reduced common area electric bill by 60%

Takoma Overlook Condominium Takoma Park MD

  • Converted all interior common area, parking garage, and Exterior to LED
  • Reduced common area electric bill by 60%

Ballston 880 Arlington VA
Converted all interior common area, parking garage, and Exterior to LED
910, 930, 942 Clopper Rd Gaithersburg MD

  • Converted all perimeter area, exterior, and common area lighting to LED
  • Installed Custom LED with optics for existing fixture retrofit

Cider Mill Apartments Gaithersburg MD

  • Converted entire 50 acre property to LED

20 & 22 Firstfield Gaithersburg MD

  • Converted all perimeter area, exterior, and common area lighting to LED
  • Installed Custom LED with optics for existing fixture retrofit

Chevy Chase Acura
Complete conversion of 1,600 fixtures to LED – saving over $5,000 a month in reduced energy cost.
JG Wentworth HQ
Complete LED conversion of all interior and exterior fixtures.
Midtown Multi Building Subdivision
Complete LED conversion of all interior common area and exterior fixtures
Evocative Data Center
Conversion of data center lighting to high efficacy LED lighting
Washington Hilton
LED retrofit of the historic Washington Hilton Garage and service areas.
U.S. Consumer Protection Agency
LED retrofit of the entire Consumer Product Safety’s Testing Facility
CSAAC center for Autism
Full LED conversion of their two MD locations
Johns Hopkins 9605 medical center
Full LED conversion of the common area as well as custom RGB color animation to 46 ft tall glass architectural Lobby feature.
IDT Biologika
Full LED conversion of all office space, clean rooms, and testing Labs
Home Innovation Research Labs
Full LED conversion of their administration building and research testing labs